Order to Turn Power On
Shown below is the recommended order to turn the power on. There should be no problem even if the order is swapped.
◆For Models with Pulse Motor Equipped and 24V AC Servomotor Equipped Model
[Order to turn power on]
[Order to turn power on]
- Turn ON the power to the peripheral devices such as PLC.
- Turn ON the control power supply (24V DC) to ELECYLINDER units.
[Time before turning ON power supply after turning it OFF]
- ELECYLINDER Unit : 1s or more after turning 24V DC power supply OFF
[Time required for ELECYLINDER startup (Power supply to initialization)]
Approx. 1s
◆For Models with 200V AC Servomotor Equipped
[Order to turn power on]
[Order to turn power on]
- Turn ON the power to the peripheral devices such as PLC.
- Turn ON the control power supply (24V DC) to ELECYLINDER units.
- Turn on the DC power supply (PSA-200) for motor drive.
After supplying the control power (L1C-L2C), supply the motor driver power (L1-L2).
Or, turn both of them at the same time.
[Time before turning ON power supply after turning it OFF]
- ELECYLINDER Unit: 1s or more after turning 24V DC power supply OFF
- DC power supply (PSA-200) for motor drive: 2s or more after turning 24V DC power supply OFF
[Time required for ELECYLINDER startup (Power supply to initialization)]
Approx. 3s